Expressways / Managed Lanes

HEFT Campbell Drive Interchange Improvements

Client:
Florida’s Turnpike Enterprise

Location:

Miami-Dade County, Florida

Service

Transportation Engineering
The Homestead Extension of Florida’s Turnpike (HEFT) improvements project required the design, widening, and reconstruction of the SR 821/HEFT and Campbell Drive to accommodate future needs for capacity, operational, and safety improvements. The project included a new westbound exit ramp at Campbell Drive to the northbound HEFT interchange ramp, widening of the existing southbound SR 821/HEFT off-ramp to two-lanes, widening of the SR 821/HEFT to accommodate the ramp improvements, and signal and turn lane improvements on Campbell Drive. The project included: upgrading the bridge approaches guardrails; installation of new pier protection barriers at Campbell Drive overpass bridges; replacement of the aluminum railing on all bridges; new noise walls; and analyses of the existing mast arms to determine whether backplates can be retrofitted, and if they can handle the current design wind speed criteria.

More Projects

SR 417 Widening from John Young Parkway

I-95 & Spanish River Blvd Interchange

SR-826/Palmetto Expressway Express Lanes – Segment 2 (Canal C-8 to NW 67th Ave)