Civil Engineering

Water and Wastewater

Turkey Creek Utilities Crossing

Client:
FDOT District 5/City of Palm Bay Utilities
Location:
Palm Bay, FL
Service:
Civil Engineering
Project Overview
As a prime consultant, EAC was responsible for the design and permitting for the relocation of three utilities that were affixed to a replacement bridge that spanned the Turkey Creek Canal in Port Malabar for Palm Bay Utilities. The utilities included an 8-inch Sewer Main, an 8-inch Reuse Main and an 8-inch Potable Water Main. EAC performed all the civil related work which included the development of construction plans and specifications, designing the horizontal and vertical alignment of the pipe, pipe connections, restraints and other appurtenances, as well as obtaining all relevant permits.

More Projects

Liberty Square Redevelopment

Design, Permitting and Construction Administration for NL1-A 60-inch Diameter Sanitary Sewer Transmission Pipeline (PCCP) Force Main

S-197 Gate Replacement and Automation Engineering During Construction

Expansion Plan for Cap Terminal SA (CTSA) for Port Cape Haitiean

FLL Airport Hydrant Fueling System Infrastructure Relocation

I-75 Alligator Alley Rest Area

Lincoln Gardens

Gallery on the River

Port Miami North Cruise Blvd – Phase 2B & 3 Improvements

Port Everglades Security Improvements

Airside 1 Improvements at Orlando International Airport (MCO)

FLL Taxi & Limo Holding Lot

New Brunswick Village

Miami-Dade Children’s Courthouse

Miami Dade Federal Courthouse

FIU Football Stadium Expansion

LAN Cargo Aircraft Maintenance Hangar Facility

Runway 19L 27R Improvements

NW South River Drive Drainage Improvements

G-335 Pump Station Trash Rake Replacement and Waterproofing

More Projects