Project Overview
EAC provided design for the reconstruction of this 1.5-mile segment of the Palmetto Expressway to widen for the implementation of Express Lanes. The existing six-lane divided limited access facility will be widened to accommodate two express lanes and provide auxiliary lanes between the interchanges. A tolling point will be provided within this section and a Single Point Urban Interchange (SPUI) will be provided at NW 67 Ave. The project requires extensive coordination with the adjacent projects, FTE, City of Miami Lakes and Miami-Dade County. The project is the second segment (Segment 2) of six segments that extends the Express Lanes from I-75 to the I-95/Golden Glades Interchange.

More Projects

Interchange Improvements to the Homestead Extension of Florida’s Turnpike

Hard Rock Stadium Pedestrian Bridges

MDX SR 83628 Operational, Capacity, and Interchange Improvements

Structural Design for the MIA People Mover

PortMiami Tunnel Peer Review

NW 97th Ave over SR 836 Bridge

More Projects