Transportation Engineering

Highways — Expressways / Managed Lanes

HEFT Campbell Drive Interchange Improvements

Client:
Florida’s Turnpike Enterprise
Location:
Miami-Dade County, Florida
Service:
Transportation Engineering
Project Overview
The Homestead Extension of Florida’s Turnpike (HEFT) improvements project required the design, widening, and reconstruction of the SR 821/HEFT and Campbell Drive to accommodate future needs for capacity, operational, and safety improvements. The project included a new westbound exit ramp at Campbell Drive to the northbound HEFT interchange ramp, widening of the existing southbound SR 821/HEFT off-ramp to two-lanes, widening of the SR 821/HEFT to accommodate the ramp improvements, and signal and turn lane improvements on Campbell Drive. The project included: upgrading the bridge approaches guardrails; installation of new pier protection barriers at Campbell Drive overpass bridges; replacement of the aluminum railing on all bridges; new noise walls; and analyses of the existing mast arms to determine whether backplates can be retrofitted, and if they can handle the current design wind speed criteria.