Civil Engineering

East Palm Drive Canal Culverting (Phase 1)

Client:
City of Florida City
Location:
Florida City, FL
Service:
Civil Engineering
Project Overview
The project’s major scope of work consists of culvert installation, pavement widening construction, milling and resurfacing, utilities adjustment and drainage improvement, and striping. This project mostly runs through residential and commercial areas. Phase I involves striping the eastbound and westbound lanes, and closing both eastbound and westbound inside lanes in order to capture the work area for the installation of the box culvert. This phase also involves installing concrete a barrier wall and performing all work for filling in the canal – which includes relocation of lighting and installation of a box culvert, embankment, stabilized subgrade, base and structural asphalt. Phase 2 involves restriping eastbound and westbound lanes; shifting traffic onto the newly constructed pavement; and closing the outside lanes in order to capture the work area for the curb gutter.

This project was awarded the ASCE Miami Chapter, Category 1, 2020 Project of the Year award.

More Projects

Liberty Square Redevelopment

S-197 Gate Replacement, Automation Engineering During Construction

NL1-A 60-inch Diameter Sanitary Sewer Transmission Pipeline (PCCP) Force Main

Expansion Plan for Cap Terminal SA (CTSA) for Port Cape Haitiean

I-75 Alligator Alley Rest Area

G-335 Pump Station Trash Rake Replacement and Waterproofing

NW South River Drive Drainage Improvements

Herbert Hoover Dike Rehabilitation and Repair

FLL Water Wastewater Master Plan

City of Rivieria Beach Lift Station Condition Assessment

City of North Miami Pump Stations Rehabilitation (PS 10 San Souci 1, PS 12 San Souci 3, PS 24 Hospital Station)

Turkey Creek Utilities Crossing

City of Miramar- Reclaimed Water System Expansion

Pine Island Road Reconstruction & Widening 30 Inch Diameter Water Main

Port Miami Basin 9141 Sanitary Sewer Rehabilitation

RMK Merrill-Stevens Shipyard Improvements

Chain Logistics Study Ports of Kingston and Montego Bay

Port Everglades Security Improvements

Port Miami North Cruise Blvd – Phase 2B & 3 Improvements

Gallery on the River