Transportation Engineering

Bridge Structures — Minor Bridge Structures

41st Beautification

Client:
Consul-Tech Engineering
Location:
Miami Beach, FL
Service:
Transportation Engineering
Project Overview
The project required rehabilitation of the 41st Street Bridges in Miami Beach, FL. This is being done as part of the improvements to the corridor to develop a signature roadway, which will spearhead the development of this portion of the City. The project required the rehabilitation of the bridges and their subsequent improvements. The improvements included: replacement of the barriers with ornamental barriers, the addition of a sidewalk canopy, the provision of planters and flagpoles as well as ornamental lighting. The bridges were also analyzed to ensure the ability to sustain the additional loads.

More Projects

HEFT Campbell Drive Interchange Improvements

Hard Rock Stadium Pedestrian Bridges

Franjo Road Complete Infrastructure & Streetscape Improvements

MDX SR 83628 Operational, Capacity, and Interchange Improvements

Monroe County Card Sound Tolling System Design-Build Project

Central Florida Expressway (CFX) Toll System Upgrade Design-Build Project

PortMiami Tunnel Peer Review

SR 90 Tamiami Trail Modifications

NW 97th Ave over SR 836 Bridge

MIA People Mover

Tom’s Harbor Bridge Repair

Port Everglades – Bridge Over FPL Canal

SR 417 Moss Park Bridge Widening

Meridian Bridge Over Collins Canal

Palm Ave from Stirling to Griffin Rd

SR968 SW 1st Street from SW 17 Ave to SW 6 Ave FDOT D6

Stock Island Roadway Improvements

NW 41st St from NW 79th to 87th Ave

First St/Bertha St Rd Improvements

Milling and Resurfacing of SR25/US-27