As a prime consultant, EAC was responsible for the design and permitting for the relocation of three utilities that were affixed to a replacement bridge that spanned the Turkey Creek Canal in Port Malabar for Palm Bay Utilities. The utilities included an 8-inch Sewer Main, an 8-inch Reuse Main and an 8-inch Potable Water Main. EAC performed all the civil related work which included the development of construction plans and specifications, designing the horizontal and vertical alignment of the pipe, pipe connections, restraints and other appurtenances, as well as obtaining all relevant permits.