Civil Engineering

Water and Wastewater

Turkey Creek Utilities Crossing

Client:
FDOT District 5/City of Palm Bay Utilities
Location:
Palm Bay, FL
Service:
Civil Engineering
Project Overview
As a prime consultant, EAC was responsible for the design and permitting for the relocation of three utilities that were affixed to a replacement bridge that spanned the Turkey Creek Canal in Port Malabar for Palm Bay Utilities. The utilities included an 8-inch Sewer Main, an 8-inch Reuse Main and an 8-inch Potable Water Main. EAC performed all the civil related work which included the development of construction plans and specifications, designing the horizontal and vertical alignment of the pipe, pipe connections, restraints and other appurtenances, as well as obtaining all relevant permits.

More Projects

Liberty Square Redevelopment

Design, Permitting and Construction Administration for NL1-A 60-inch Diameter Sanitary Sewer Transmission Pipeline (PCCP) Force Main

Expansion Plan for Cap Terminal SA (CTSA) for Port Cape Haitiean

S-197 Gate Replacement and Automation Engineering During Construction

RMK Merrill-Stevens Shipyard Improvements

I-75 Alligator Alley Rest Area

More Projects