FLL Airport Hydrant Fueling System Infrastructure Relocation

Client:
Broward County Aviation Department
Location:
Fort Lauderdale International Airport Fort Lauderdale, FL
Service:
Civil Engineering
Project Overview
As part of the Broward County Aviation Department’s (BCAD’s) airport expansion program at FLL, this project consisted of the relocation of the existing aircraft hydrant fueling system, which was in conflict with the proposed expansion and gate replacement of Terminal 4 and the associated South Runway Expansion. EAC led a team of six specialized sub-consultants for the $21.3M fueling system relocation. The proposed aircraft hydrant fueling system was comprised of a primary 14” double-walled main line and a secondary 12” double-walled line. Both fuel lines are connected to the existing system at Gate F-2, Terminal 3 (on the west side), encircle the proposed Concourse G with a minimum 100’ offset (as per NFPA 415), and connect on the east side of Concourse G near South Terminal Drive. Fourteen new hydrant pits are served from the 12” secondary line with two intermediate valve vaults to isolate sections of the fuel lines during maintenance or an emergency.

More Projects

Liberty Square Redevelopment

Design, Permitting and Construction Administration for NL1-A 60-inch Diameter Sanitary Sewer Transmission Pipeline (PCCP) Force Main

Expansion Plan for Cap Terminal SA (CTSA) for Port Cape Haitiean

S-197 Gate Replacement and Automation Engineering During Construction

Port Miami Basin 9141 Sanitary Sewer Rehabilitation

I-75 Alligator Alley Rest Area

More Projects