Project Overview
The project consists of rehabilitation and repair of the sanitary sewer systems where portions, components and segments of the existing system are damaged or deteriorated. The rehabilitation of pipelines consists of the installation of an approved resinimpregnated flexible tube which, when cured, shall be continuous and tight-fitting throughout the entire length of the original pipe. The repairs also include segments of pipe to be removed and replaced and manholes repairs and coating; As part of this project, an existing pump station is being demolished that included the removal of existing pumps, electrical panels, a fence and other appurtenances. The project areas are then to be restored with flexible pavement, rigid pavement and sod as required.

More Projects

Liberty Square Redevelopment

S-197 Gate Replacement, Automation Engineering During Construction

NL1-A 60-inch Diameter Sanitary Sewer Transmission Pipeline (PCCP) Force Main

Expansion Plan for Cap Terminal SA (CTSA) for Port Cape Haitiean

I-75 Alligator Alley Rest Area

G-335 Pump Station Trash Rake Replacement and Waterproofing

NW South River Drive Drainage Improvements

Herbert Hoover Dike Rehabilitation and Repair

East Palm Drive Canal Culverting (Phase 1)

FLL Water Wastewater Master Plan

City of Rivieria Beach Lift Station Condition Assessment

City of North Miami Pump Stations Rehabilitation (PS 10 San Souci 1, PS 12 San Souci 3, PS 24 Hospital Station)

Turkey Creek Utilities Crossing

City of Miramar- Reclaimed Water System Expansion

Pine Island Road Reconstruction & Widening 30 Inch Diameter Water Main

RMK Merrill-Stevens Shipyard Improvements

Chain Logistics Study Ports of Kingston and Montego Bay

Port Everglades Security Improvements

Port Miami North Cruise Blvd – Phase 2B & 3 Improvements

Gallery on the River