Highway design services for the milling, resurfacing, widening and reconstruction of Palm Avenue from Stirling to Griffin Road. The existing roadway is a two-lane undivided facility that extends for approximately 1.4 miles within the project limits. The design resulted in a four-lane divided roadway with adequate storm water treatment, conveyance, disposal and management.