EAC provided the civil design services required for the proposed $150 Million Miami Federal Courthouse. The civil engineering services included: the paving layout and design, the drainage/site design, the coordination of the utilities, the provision of new utility services, the preparation of a demolition plan, the closure of a street which presently runs down the middle of the property, the coordination required for the abandonment of a 60-inch sewer force main and the site work and coordination related to the proposed connector tunnel which passes below the site. The utility service includes the provision of a potable watermain, fire protection service and sanitary sewage system(s) for the property. This project included a parking garage on the lower levels of the building for 110 vehicles.