Technology and Systems

Tolling

In-Lane ORT System Replacement on SR-874, SR-878 and SR-924

Client:
Miami-Dade County Expressway Authority (MDX)
Location:
Miami-Dade County, Florida
Service:
Technology and Systems
Project Overview
Replacement of the legacy ORT system for 42 lanes on SR 874, SR 878 and SR 924. EAC managed the design, installation and commissioning of a new in-lane ORT system. In addition, EAC was the in-house EOR for the design of the civil infrastructure modifications needed for the new toll collection system. The project required extensive coordination with the roadway Contractor and the Toll System Integrator.

More Projects

FDOT District 6 District-wide Replacement of 13 Dynamic Message Signs Design-Build Project

In-Lane Open Road Tolling System Deployed for the Greater Miami Expressway Agency (GMX)

FDOT District 6 I-95 Express Lanes Dynamic Message Signs Replacement Design-Build Project

Panama Electronic Tolling System Audits

Monroe County Card Sound Tolling System Design-Build Project

FDOT District 4 SR 93 / I-75 Rest Area and Environmental Education Project Truck Parking Availability System

MDX SR 836 West Extension ORT and ITS Deployment

MDX Transportation Management Center (TMC) Operations

MDX System-Wide Implementation Of Dynamic Message Signs (DMS)

MDX/FDOT SR 826 / SR 836 Interchange Reconstruction

MDX SR 924, SR112, SR 874 and SR 878 Communications & Incident Management/Surveillance Deployment Projects

Central Florida Expressway (CFX) Toll System Upgrade Design-Build Project

Tampa Hillsborough Expressway Authority (THEA) General Engineering Consultant Services

More Projects