The scope of work executed by EAC Consulting, Inc. involved the following: Phase 1, EAC described the Ft. Lauderdale-Hollywood International Aiport’s (FLL) existing wastewater system, including the description and discussion of all elements of the system, with sufficient detail for analyses and the planning of short term, interim term and long term needs. EAC provided an inventory of existing wastewater system facilities in an ESRI GIS format, including, but not limited to system piping, pump stations and all other information necessary to fully describe existing conditions. EAC included all information and findings on the GIS database platform.