Technology and Systems

Tolling

FDOT District 4 SR 93 / I-75 Rest Area and Environmental Education Project Truck Parking Availability System

Client:
FDOT – District 4
Location:
Tampa, Florida
Service:
Technology and Systems
Project Overview
EAC provided ITS design services as part of this Project. ITS components include truck parking availability system, CCTV cameras and fiber optic cable based communications system.

More Projects

FDOT District 6 District-wide Replacement of 13 Dynamic Message Signs Design-Build Project

MDX SR 112 and SR 836 In-Lane Open Road Tolling (ORT) System Deployment

FDOT District 6 I-95 Express Lanes Dynamic Message Signs Replacement Design-Build Project

Panama Electronic Tolling System Audits

In-Lane ORT System Replacement on SR-874, SR-878 and SR-924

Tampa Hillsborough Expressway Authority (THEA) General Engineering Consultant Services

Monroe County Card Sound Tolling System Design-Build Project

Central Florida Expressway (CFX) Toll System Upgrade Design-Build Project

MDX/FDOT SR 826 / SR 836 Interchange Reconstruction

MDX System-Wide Implementation Of Dynamic Message Signs (DMS)

MDX SR 924, SR112, SR 874 and SR 878 Communications & Incident Management/Surveillance Deployment Projects

MDX Transportation Management Center (TMC) Operations

MDX SR 836 West Extension ORT and ITS Deployment