Transportation Engineering

Highways — Complete Streets / Bike Paths

Complete Infrastructure & Streetscape Improvements on Franjo Road

Client:
Village of Palmetto Bay
Location:
Palmetto Bay, Florida
Service:
Transportation Engineering
Project Overview
This project consisted of the reconstruction of SW 9th Avenue (Franjo Road) into a future Main Street and thoroughfare for the Village of Palmetto Bay. The purpose was to significantly enhance the area’s physical conditions through infrastructure improvements and to promote future growth in accordance with the Village’s Downtown Urban Village (DUV) code. The project included the design of Complete Streets – streets having Americans with Disabilities Act (ADA)-compliant sidewalks and curb ramps, bike lanes, landscapes, and on-street parking). Project features also included traffic calming, new stormwater management systems, new 12-in diameter watermains, gravity sewer mains, a street park, landscape and hardscape improvements, textured pavements, corridor decorative lighting, and miscellaneous street furnishings.

More Projects

Interchange Improvements to the Homestead Extension of Florida’s Turnpike

Hard Rock Stadium Pedestrian Bridges

MDX SR 83628 Operational, Capacity, and Interchange Improvements

Improvements to the PortMiami Wharf 6 & 7 Cargo Yards

PortMiami North Cruise Blvd Flyover Bridge

Monroe County Card Sound Tolling System Design-Build Project

Tom’s Harbor Bridge Repair

MiamiCentral Station – Brightline

Structural Design for the MIA People Mover

Reconstruction, Milling and Resurfacing of SW 1st Street in Miami-Dade County

Milling and Resurfacing SR 25/US 27

PortMiami Tunnel Peer Review

I-75 Alligator Alley Rest Area

MIC Earlington Heights

IndyGo Downtown Transit Center

41st Beautification

Good Homes Road

IndyGo Red Line Bus Rapid Transit

Charlotte Area Transit System (CATS) – Blue Line Extension (BLE)

SFRTA Tri Rail (GEC)

More Projects