Replacement of the legacy ORT system for 42 lanes on SR 874, SR 878 and SR 924. EAC managed the design, installation and commissioning of a new in-lane ORT system. In addition, EAC was the in-house EOR for the design of the civil infrastructure modifications needed for the new toll collection system. The project required extensive coordination with the roadway Contractor and the Toll System Integrator.