Construction Management

Water and Wastewater

Immokalee Water Distribution System Improvement Project

Client:
Seminole Tribe of Florida
Location:
Immokalee, Florida
Service:
Construction Management
Project Overview
Installation of 1.5 miles of a 6-10-inch PVC, and 10-12-inch DIPS HDPE water main installed using directional bore and open trench. This project includes also the installation of gate valves, insertion valves, tees, and fire hydrants. This watermain is being installed through highly sensitive wetlands of the Everglades. Provided assistance to the Construction Manager in processing and keeping track of Request-for-Information, Submittals, Change Orders, Monthly Progress Schedules and Testing. In charge of verification of compliance with Environmental and Dewatering Permits.

More Projects

Construction Engineering and Inspection Services for the Reconstruction and Widening of Pine Island Road

SR-836/I-395 Interim Project from NE 1st Avenue to Macarthur Causeway

Broward County Water & Sewer Neighborhood Improvements

Construction Engineering and Inspection for FDOT SR 7 Projects from Broward to Palm Beach County

WASD Project Management and Construction Management Consent Decree Program

SR-821/HEFT Resurfacing and Safety Improvements

SR-934/ NW 79th Street Grouping

NW/SW 8th Avenue & Hallandale Beach Boulevard Intersection Improvements

Construction Engineering Inspections (CEI) for The Village Of Key Biscayne Stormwater Improvements (Sea Level Rise)

Media Art and Dorsey Park Roadway Improvements Projects

NW 21st Avenue from NW 19th Street to Oakland Park Boulevard

Country Isles Water Services Replacement Construction Engineering and Inspection

City of Miami Beach – Biscayne Point Neighborhood Infrastructure Improvements

SR-821/HEFT – Bridge Painting Ramp

More Projects