This project scope involved the replacement of existing water service connections from the existing water main located within public right of way to water service meters located in public right of way or(easement) for 179 homes within Country Isles. Work included water service connection to existing distribution main, water service construction from the point of connection to the service meter, disconnection/removal of existing service, and surface restoration of pavement or existing ground cover within public right of way.